Process units and pipe racks at the SOCAR Methanol Plant

Image 1 of 1

About this project

MGH İnşaat MMC carried out thermal insulation works during repair works at the Methanol Plant of the State Oil Company of the Azerbaijan Republic (SOCAR) in Baku.

The company completed its most recent contract at the plant as general contractor in 2024. It had previously performed thermal insulation works at the same plant as a subcontractor under a contract signed in 2019.