Heydar Aliyev Oil Refinery — Construction and Reconstruction Works

Baku, Azerbaijan

Completed
Aerial view of the Heydar Aliyev Oil Refinery in Baku

Image 1 of 2

About this project

Between 2021 and 2024, MGH İnşaat MMC carried out a series of contracts as general contractor at the SOCAR Heydar Aliyev Oil Refinery in Baku, covering the construction and reconstruction of industrial buildings and facilities.

Repair and reconstruction works included repairs to the 120-metre flue stack of Unit 43 at Production Facility No. 4, relocation of utility lines on the site of the refinery's new laboratory building, general repair and construction works, and the repair and replacement of service platforms, stairways and handrails.

Protective and insulation works included painting of process equipment, pipe racks and pipelines across the refinery's production areas, as well as thermal insulation works.

Piping works included connecting a Dn 530×8 mm steel pipeline, built under the refinery's modernisation and reconstruction project, to the existing 1,200 mm Azersu trunk main.

Environmental works included the neutralisation of oily sludge and its removal from the refinery site, and the sludge cleaning of tank T-108.

The company also carried out landscaping and improvement works, including street art, at the refinery's Azerneftyag site in connection with COP29, as well as the dismantling of a vacuum column.