As general contractor to the Azerikimya Production Union, MGH İnşaat MMC carried out repair and restoration works at the Ethylene-Polyethylene Plant in Sumgayit between 2022 and 2024.
In 2022, the company performed the capital repair of the flare unit in Section 26 (water supply, water cooling and sewerage) of the plant.
In 2024, as part of the planned TAR2024 capital overhaul, MGH İnşaat repaired and restored fully and partially unserviceable service platforms, stairways, handrails and ladders across all areas of the plant.
Scope of work
- Structural Construction
- Mechanical Works