SOCAR Oil Pipelines Department — Main Oil Pipeline Works

Azerbaijan

Ongoing
Pipeline valves and pig launcher at a SOCAR oil pipeline facility

Image 1 of 4

About this project

In 2023, MGH İnşaat MMC was awarded a series of contracts as general contractor by the Oil Pipelines Department (Neft Kəmərləri İdarəsi) of SOCAR.

Under the reconstruction programme to transfer SOCAR oil via the Shirvan–Böyük-Şor Ø500 mm oil pipeline and from the Sangachal and AzərTrans terminals into the BTC pipeline, the company's scope covers the technological part of oil metering units for complexes I and IV, the interconnection of the Dübəndi–Böyük-Şor and Shirvan–Böyük-Şor Ø500 mm oil pipelines at the Böyük-Şor oil pumping station, and the laying of the Shirvan–Böyük-Şor Ø500 mm pipeline.

Further contracts cover modification works at the Shirvanlı and Sumgayit oil pumping stations to enable reverse flow via the ŞİBK pipeline, the capital repair of the Böyük-Şor–Sumgayit Ø700 mm main oil pipeline with pipe replacement on sections totalling 4.56 km between km 8.0 and km 19.5, and the construction of two RVS-5000 m³ oil storage tanks at the Sumgayit oil pumping station.