Alban Project Solutions — Gas Distribution Stations and Pipeline Works

Azerbaijan

Completed
Excavator digging a trench for the Qaradağ–Digah 720 mm gas pipeline

Image 1 of 3

About this project

Between 2022 and 2023, MGH İnşaat MMC worked as a subcontractor to Alban Project Solutions CJSC. The company presentation describes this work as the construction of gas distribution stations (GDS) and gas regulating points (GRP).

The contract records include coating and insulation of the D720×8 mm pipeline, with cleaning of corroded surfaces, on the water pipeline project between the Qumyataq pumping station and the Heydar Aliyev Oil Refinery (2022), and laying an insulated Ø720 mm pressurised main gas line into the trench on the Qaradağ–Digah QPR section (contract of 2023).